Precision-digital PD6100 Manual de usuario Pagina 43

  • Descarga
  • Añadir a mis manuales
  • Imprimir
  • Pagina
    / 100
  • Tabla de contenidos
  • SOLUCIÓN DE PROBLEMAS
  • MARCADORES
  • Valorado. / 5. Basado en revisión del cliente
Vista de pagina 42
Model PD6100 Strain Gauge/Load Cell Meter Instruction Manual
43
Calibrating the Meter with Strain Gauge/Load Cell (Cal)
To scale the meter without a signal source
refer to Scaling the Meter (
SCALE), page 44.
The meter can be calibrated to display the process variable in
engineering units by applying the appropriate input signal and following
the calibration procedure.
The use of a calibrated signal source is strongly recommended to
calibrate the meter.
Warm up the meter for at least 15 minutes
before performing calibration to ensure
specified accuracy.
Multi-Point Calibration & Scaling
The meter is set up at the factory for 2-point linear calibration. The
number of points for multi-point calibration/scaling is set up in the
Advanced Features menu. Up to 32 linearization points may be selected
for PV1 and up to 8 linearization points may be selected for PV2. See
page 78 for details.
T
he display flashes
while sensing
the inputs
Vista de pagina 42
1 2 ... 38 39 40 41 42 43 44 45 46 47 48 ... 99 100

Comentarios a estos manuales

Sin comentarios